Claim prevention is applied both in the Design and Construction Phase. Most effectively when the design is sufficiently complete with value engineering reviews. During the construction Phase claims prevention entails detail contractual compliance with close monitor of the notification process, implemented with tools developed throughout the years. Interfaces between contracts, planning and cost personnel is enhanced, to ensure validity of results, and enable proper and timely decision making.
